• chaogomu@lemmy.world
    link
    fedilink
    English
    arrow-up
    23
    arrow-down
    5
    ·
    17 hours ago

    Extremely.

    Even adding in construction and mining, it has the lowest carbon per KWh out of any option. Even Hydro comes out worse, due to the years of carbon and methane emissions from the decaying plant matter at the bottom of the newly formed lake.

    Wind and solar are down there, but the mining costs and the low output per unit tend to bump the numbers.

    Noted, that’s just the carbon released. There are other metrics, and nuclear tends to meet most all of them because it’s very heavily regulated.

    • Richard@lemmy.world
      link
      fedilink
      English
      arrow-up
      4
      arrow-down
      1
      ·
      4 hours ago

      That’s one hell of a claim. In fact such an outrageously bold one that you shouldn’t be able to post a comment like that without citing a reputable source.

      • Holytimes@sh.itjust.works
        link
        fedilink
        English
        arrow-up
        2
        ·
        3 hours ago

        It’s not that bold or outrageous… It’s been common knowledge for over 40 years.

        Basically since the dawn of nuclear power plants we knew it was the cleanest form of energy generation. That was literally its selling point.

        The problem was the fear of radiation if shit went wrong.

        • oce 🐆@jlai.lu
          link
          fedilink
          English
          arrow-up
          1
          ·
          edit-2
          1 hour ago

          The consequence of this legitimate fear is crazy security and the cost of it. To the point where the cost of new nuclear now struggles to compete with renewables. The new generation plants EPR are catastrophic in terms of budget and schedule.

    • fullsquare@awful.systems
      link
      fedilink
      English
      arrow-up
      4
      arrow-down
      1
      ·
      6 hours ago

      Coal ash (from some mines) contains so much uranium that if emissions like this were detected near NPP all hell would break loose, but nobody cares. Energy content of that uranium can be higher than what was released during coal combustion

      • woelkchen@lemmy.world
        link
        fedilink
        English
        arrow-up
        2
        arrow-down
        1
        ·
        5 hours ago

        “coal ash is worse” doesn’t make nuclear waste clean and non toxic. Both are dirty, just different kinds of dirt. Geothermal is an excellent “boil water” technology independent of weather and without toxic waste.

        • fullsquare@awful.systems
          link
          fedilink
          English
          arrow-up
          2
          ·
          5 hours ago

          there are still coal powerplants around and any replacement is better. geothermal doesn’t work everywhere

    • Zagorath@quokk.au
      link
      fedilink
      English
      arrow-up
      8
      ·
      9 hours ago

      This page’s “Life cycle CO2 equivalent (including albedo effect)” page says Nuclear is just a hair worse than onshore wind in the median case, significantly worse than both on- and offshore wind in the worst case (worst for both types), and slightly better in the best case. In best case, hydro actually beats nuclear.

      Also, TIL tidal power isn’t commercially in use. I swear we were learning about it in school 20 years ago, and were not even told then that it wasn’t viable.

      Including the effects of albedo seems rather straightforward and worth doing. Of course it neglects some more complicated factors, like opportunity cost of staying on fossil fuels in the meantime for the 20+ years it takes to build nuclear. A convenient part of the reason that the biggest proponents of nuclear tend to be those politicians and special interests who also support fossil fuels.

      • cynar@lemmy.world
        link
        fedilink
        English
        arrow-up
        3
        arrow-down
        2
        ·
        6 hours ago

        Coal plants put out more radioactive material than even the bomb factories they call nuclear power plants. Newer plant designs are FAR more fail safe too, and some can actually ‘eat’ the waste from older plants.

        New nuclear is right up there with renewables, with the added bonus of being great for baseloads. The only problem is we needed to be building it 20 years ago, since it takes a long time to design, permit and build them properly. If we try to rely on them now, it will be too late.

        • 0x0@lemmy.zip
          link
          fedilink
          English
          arrow-up
          2
          ·
          4 hours ago

          since it takes a long time to design, permit and build them properly.

          That’s been rigged by design due to… interests… it doesn’t take that long to build one.

          • cynar@lemmy.world
            link
            fedilink
            English
            arrow-up
            2
            ·
            4 hours ago

            Fully agreed, though it’s also something you really don’t want done on too much of an accelerated timeline. Rushing the construction, when the fail-safes rely on it, and it will be an absolute bitch to fix later, is a poor plan.

            Unfortunately the red tape has become far too risk adverse. E.g. the reactors china is now building were designed in the UK. The UK government killed 5 attempts to get them built through red tape and time killing. Eventually a Chinese scientist found out about the plans. (With permission) he contacted the Chinese government. Sufficient to say, those plans formed the basis for the newer Chinese reactors they are building out now. They are also exporting the expertise, since most western countries have had their skilled engineers reach retirement, before passing on their skills and knowledge.

            In practice, you are looking at 5-10 years minimum, from site selection to power on.

            • 0x0@lemmy.zip
              link
              fedilink
              English
              arrow-up
              2
              ·
              3 hours ago

              True

              In practice, you are looking at 5-10 years minimum, from site selection to power on.

              Still beats 20.

              • cynar@lemmy.world
                link
                fedilink
                English
                arrow-up
                2
                ·
                2 hours ago

                Very true. It unfortunately doesn’t include the delays from bureaucracies throwing excessive red tape at the project, with the goal of, if not killing it, kicking the decision down the road till it’s someone else’s problem. The UK government has been problematic on that front.

                I might be an optimistic pessimist.

          • cynar@lemmy.world
            link
            fedilink
            English
            arrow-up
            4
            ·
            4 hours ago

            It’s relative harm. New nuclear is far cleaner than coal, and can slot into it’s place in the grid. We should have done this decades ago, but the plans languished till china found out about them. (Much to the designers joy)

            It’s also not an either/or situation. As china is demonstrating, there is a limit to how quickly you can roll out renewables. Doing other, pollution reduction in parallel makes sense.

            Taking nuclear off the table was the biggest win the oil barrons pulled off.

            On a plus side, we will finally find out if fusion is viable in the next 5-10 years. The first over-unity test reactors, designed for sustained operation are being built.

              • cynar@lemmy.world
                link
                fedilink
                English
                arrow-up
                1
                ·
                3 hours ago

                Fusion has been 10 years away, with proper funding. It never got that funding. It struggled to maintain the break even funding to keep skilled people employed, and the lights on.

                The difference is that over unity has been achieved, in a normally sustainable manner. The funding is such that it’s 5-10 years at current funding. Most of that is building the actual test plants.

                I fully agree that renewables are currently the best cost option. The catch is that they are not viable everywhere. They are also inherently low density, so can get expensive in certain areas.

                Basically, we want a mix of options, to fit local requirements. Nuclear (and later fusion) should be part of the plan.

                In practice, I’m of the take what we can get. We need to crash CO2 output, and we need to do it yesterday. Anything speeding that up is a win, as far as I’m concerned.