• 0x0@lemmy.zip
    link
    fedilink
    English
    arrow-up
    2
    ·
    2 小时前

    True

    In practice, you are looking at 5-10 years minimum, from site selection to power on.

    Still beats 20.

    • cynar@lemmy.world
      link
      fedilink
      English
      arrow-up
      2
      ·
      2 小时前

      Very true. It unfortunately doesn’t include the delays from bureaucracies throwing excessive red tape at the project, with the goal of, if not killing it, kicking the decision down the road till it’s someone else’s problem. The UK government has been problematic on that front.

      I might be an optimistic pessimist.