• ltxrtquq@lemmy.ml
    link
    fedilink
    English
    arrow-up
    4
    arrow-down
    1
    ·
    7 months ago

    Project founder Thorsten Försterling tells us that the team is working on a track-installed machine that will be able to lift individual pods off of one rail and place them on the other (without passengers in them at the time), keeping them from all collecting at either end of the route.

    Still sounds dumb to me. How much effort would it be to lay down a second track, rather than invent a gyroscope-balanced pod that can propel itself along a single railroad rail, along with a specialized machine to move it over to the other rail?